Clique ConsultPvt. Ltd.
HomeAbout
Services
ProjectsTeamBlogContact
+977-01-6631853Get in Touch
Clique ConsultEngineering

Quick Links

  • Home
  • About Us
  • Our Services
  • Property Valuation
  • Projects
  • Our Team
  • Blog
  • Contact Us

Our Services

  • Valuation Services
  • Structural Design
  • Architectural Design
  • Construction Supervision
  • Building Assessment
  • Project Feasibility Study
  • Quantity Estimation

Contact Us

  • Kaushaltar, Madhyapur Thimi-03, Bhaktapur, Bagmati Province, Nepal
  • +977-01-6631853
  • info@cliqueconsult.com.np
  • Mon – Fri: 9:00 AM – 5:00 PM

    Closed on Saturday, Sunday

© 2026 Clique Engineering Consultancy Pvt. Ltd.. All rights reserved.

Registered in Nepal | NEC Registered Engineering Firm

All Projects
hydropowerFeasibility StudyHydropower Engineering

Feasibility Study of Melamchi Indrawati Hydropower Project (5 MW)

Melamchi, Sindhupalchok5 MW
Melamchi River valley, Sindhupalchok

Project Overview

Feasibility study of the 5 MW Melamchi Indrawati Hydropower Project at Melamchi, Sindhupalchok District, carried out for Estate Energy Pvt. Ltd.

Scope of Work

  • Site investigation and topographical survey of project components
  • Hydrological and sediment analysis
  • Optimization of project layout and installed capacity
  • Design of headworks, waterways and powerhouse
  • Cost estimate and financial analysis

Project Details

Client
Estate Energy Pvt. Ltd., Baluwatar, Kathmandu
Location
Melamchi, Sindhupalchok, Sindhupalchok
Capacity
5 MW

Similar Project?

Tell us about your requirements and we'll provide a custom proposal.

Get a Quote

Ready to Start Your Project?

Our team has the expertise to handle projects of any scale, anywhere in Nepal.

Get a Free ConsultationView Our Services